Tasks and time
Add tasks with dates typed in the title, work them in a list, board or calendar, and track time with timers and a weekly timesheet.
- Plans
- Every plan
- Who can
- Everyone; teammates' timesheets for owners and admins
- Where
- Work
- Last updated
Tasks are the follow-ups on your records: calls to make, emails to send, things to check.Work has three tabs: My queue for what needs you next, All tasks for everyone’s, and Timesheet for time spent.
#Add a task
- On a record, click Add task in the rail, or New task in All tasks.
- Write what needs doing. End it with a day to set the due date: tomorrow, fri, next week, in 3 days or 14 Dec. “Send pricing fri” becomes “Send pricing”, due Friday.
- Choose the type and priority, and click Add task.
From an email: on a record’s Emails tab, open the thread and click Create task. The task is titled after the email, says which email it came from, and sits on the same record. From a conversation, use Task in the inbox.
#All tasks
A list, a board or a calendar of every task, with filters, sort, grouping and saved views. Click a task to open it beside the list; J and K move between tasks.
#Track time
- Open a task and click Start timer. The button counts while you work; click Stop and the time is logged. One timer runs at a time: starting another stops the first.
- For time already spent, click Add time, write it as 45m, 1h 30m or 1.5h, choose the day, and add what you did.
- Every entry is listed on the task with who logged it; remove your own with ×.
#Timesheet
Work → Timesheet shows a week, Monday to Sunday: a row per task with its time each day, the total per day, and the week’s total. Move between weeks with the arrows. Owners and admins can choose a teammate, or Everyone, under Whose time. A running timer shows at the top with Stop.